With over 500 successful projects under our belt, we simplify the ADU permit process so you can focus on what matters most—bringing your vision to life.
Dealing with complicated paperwork and municipal requirements can be daunting for anyone– except us, of course. Throughout the entire process, we manage the permitting and coordinate fees, providing you with concierge-level support to ensure your ADU project progresses as efficiently as possible.
We pinpoint the exact surveys and documentation needed for your location to ensure that no detail is overlooked.
We handle all interactions with relevant agencies and governing bodies on your behalf.
We create comprehensive plans that can be easily submitted where needed.
We address complex reviews from the local planning department to minimize delays
We prepare all the necessary paperwork for review.
We manage and coordinate fee payments.
We only recommend contractors who have a proven track record of quality, reliability, and excellence in ADU development.
Whether you have questions, concerns, or changes, our team is happy to be on standby if anything comes up.
We’re confident in the builders we recommend. Rest assured knowing that they carry the necessary credentials, insurance, and warranties.
Initial site visit and review of existing utility conditions.
811 Dig Alert submittal for underground gas and electric services if needed.
Recommendation for panel or gas meter placement to meet utility standards.
Preparation and submittal of SDG&E new service application.
Utility design review for conformance and accuracy.
Estimated utility timelines and construction dates coordination.
Trenching and inspection scheduling with the construction team.
Service connection completion and power is energized.
A Pre-fabricated ADU is built off-site in a factory, then delivered and installed in your backyard. Prefab ADUs use streamlined, factory-controlled construction, standardized designs, and reduced on-site labor.
The estimated timeline to build a Pre-Fab ADU is ~3-4 weeks after permitting compared to an estimated timeline of 2-3 months for a traditional single-story ADU
Prefab ADUs cost roughly 25-36% less per sqft than stick builds for material and labor costs
Factory production optimizes materials, reducing excess waste
Our Prefabs are federally certified by HUD so you can bypass state energy requirements for faster approvals.
Most of the work happens off-site, which means less noise, mess, and inconvenience at your property.
Using repeatable processes and skilled teams, we deliver consistent craftsmanship and quality
Our floor plans are fully customizable to fit your style, space requirements, and goals. Explore some of our favorite ADU floor plans or create one from scratch with your design team.
We understand that every project is unique. Our team of experts personalizes all of our services to meet your goals, keeping you informed the entire time so you’re never in the dark.
Obtaining the necessary permits for your ADU is crucial for ensuring that your project is safe and can begin as planned. Without an ADU permit:
Our team is currently working on pre-approved ADU plans! In the meantime, our designers are experienced in creating or customizing floorplans that work perfectly with your unique space.
Permit and inspection fees for ADUs vary depending on location, project size, and ADU type. For a single ADU, the estimated cost for permitting is between $1,500 and $4,500. However, there are a number of other soft costs involved with getting permits issued, such as land surveys, designing fees, and studies.
The timeline to get all necessary permits can vary depending on your municipality but is typically around 16-24 weeks. By working with ADU Geeks, you’re able to spend that time focusing on other things and save time instead of constantly checking your application or running down to your county’s Planning and Development Office.
Our projects showcase what’s possible. We've helped numerous clients transform properties, creating housing that uplifts neighborhoods. Now, it's your turn.